Kit Homes Goolwa – Elevated Flooring Options
Can iBuild’s kit homes be elevated and what is the building time frame? – Nakita Goolwa, SA
“Can your kit homes be elevated? And what is the building timeframe?
– Nakita, Goolwa SA
Our kit homes offer flexibility in terms of the foundation, with the option of either an elevated floor system or a slab. For clients who need a quick turnaround, we recommend the elevated floor system as it typically has a shorter construction timeframe. On the other hand, building a slab may take longer due to factors such as waiting for sub-contractors, plumbers, concreters, council inspections, and other variables. In addition, an elevated floor system can be more cost-effective for sites with steep slopes.
The building timeframe for an iBuild home, such as the Avila, typically ranges from 2-3 months. However, the exact timeframe can vary depending on several factors. The size of the kit home is one such factor, as larger homes may take longer to assemble. Weather conditions can also impact the construction process, potentially causing delays. Additionally, the expertise and availability of the carpenters or tradesmen involved in the project can affect the overall building timeframe.